The customer reported he needed air conditioning in each room. Because of this, we cannot resolve the issue with the ceilings at the moment. We will immediately finish the ceilings once the climate control equipment is in place |
The customer reported he needed air conditioning in each room. Because of this, we cannot resolve the issue with the ceilings at the moment. We will immediately finish the ceilings once the climate control equipment is in place |
Currently, there are metal profile sheets installed on the ceilings. Later, we will cover the ceilings with drywall, plaster them, and paint them |
Currently, there are metal profile sheets installed on the ceilings. Later, we will cover the ceilings with drywall, plaster them, and paint them |
We created a pit 7 meters deep |
We created a pit 7 meters deep |
and a reinforcement cage |
and a reinforcement cage |
We filled the entire pool, both the base and the walls, with durable concrete |
We filled the entire pool, both the base and the walls, with durable concrete |
We’ve already laid the pipes and installed insulation. That will prevent water from entering the pool from the outside |
We’ve already laid the pipes and installed insulation. That will prevent water from entering the pool from the outside |
There are skylights to provide natural light to part of the pool. Initially, they were too small. At the customer’s request, we are now working to expand them |
There are skylights to provide natural light to part of the pool. Initially, they were too small. At the customer’s request, we are now working to expand them |
We carry out construction work